ACS of the ball drum mills BDM 287/410 of the boiler #7,8,9 of BKZ 160–100 PT
State:

  • 2016-11-23: service #5
  • 2015-12-22: finished for BDM8
  • 2010-08: finished for BDM7,9

Founded: Jul 2009 for BDM7,9; 26 Jun 2015 for BDM8
Members: Roman Savochenko, Maksim Lisenko (2009-2010), DIYA Ltd
Description: Automation Control System (ACS) of loading two ball drum mills "BDM 287/410" of boilers #7, 8, 9
Location: Ukraine, Kramatorsk city, CHP
Customer: Limited liability company (Ltd) "Kramatorskteploenergo", Osipov Jury Mikolajevich
Initially created: in the old Wiki

BallMills sau.png

ACS of Phosphating, Amination and Hydrazine of boiler BKZ 160–100 PT
State:

  • 2016-11-23: service #5
  • 2015-12-14: service #4
  • 2015-12: finished for the continuous blowing
  • 2015-11-17: service #3
  • 2015-07-29: service #2
  • 2015-03-10: service #1
  • 2014-12: finished

Founded: October 2013
Members: Roman Savochenko, DIYA Ltd
Description: Automation Control System (ACS) of Phosphating, Amination, Hydrazine, Continuous blowing of the boiler's water of boilers BKZ 160–100 PT №6,7,8,9
Location: Ukraine, Kramatorsk city, CHP
Customer: Limited liability company (Ltd) "Kramatorskteploenergo", Osipov Jury Mikolajevich
Initially created: in the old Wiki

Kram diya sau water.png

OpenSCADA using on AWP of operator into ASKDK system on a petroleum base of the affiliate "East" of OAO "Krasnodarnefteproduct"
Finish: 12 (December) 2012
Customer: OAO "Krasnodarnefteproduct" (http://knp.krsn.ru)
General Contractor: "TREY-Holding" Ltd — the affiliate "Trey-Krasnoyarsk" (http://www.trei-gmbh.ru)
Subcontractor: "Kvant" Ltd
Developer of the ACSTP project: "TREY-Holding" Ltd — the affiliate "Trey-Krasnoyarsk"
Manufacturer and supplier of the ACSTP equipment: "TREY-Holding" Ltd
Author of the article leading engineer of ACSTP Kucherjavij R.O. ("TREY-Holding" Ltd — the affiliate "Trey-Krasnoyarsk")
Description: the system intended for continuously measurement and control of the surrounding technological installation of the gas environment on territory of the petroleum base and self-represents as an alarming system.

ASKDK East img6.png

Data acquisition and visualization system of the boiler #1 of workshop of CHP Plant
Begin: 07 (Jul) 2012
Finish: 08 (August) 2012
Location: Kamjanske, boiler "TP-35–39 M #1"
Customer: "EVRAZ BagleyCoke", Denis Auchenkov
Participants: "DIYA" Ltd, Roman Savochenko
Description: Replacing to an environment with OpenSCADA of an early created system of dispatching control of boiler and PLC #1 in a reason of it support lack and an overall critical state.

BagleyBoiler1 sch.png

Dispatching of electricity shield of Irkutsk HES(Heat Electropower Station)-10
Begin: 02 (February) 2011
Finish: 24 02 (February) 2011
Location: Irkutsk
Customer: Valeriy Nikolaev
Participants: Roman Savochenko, Maxim Lysenko
Description: Creating the firmware of the dispatcher's station, the configuration of data acquisition from the equipment of the switchboard room and creation of the user interface.
Materials: page (restricted access)

Irkutsk main mn.png

Dispatching of the carriage-wash system
Begin: 08 (August) 2009
Finish: 11 (November) 2009
Location: Kiev. Central railroad passenger station
Customer: Soyuz-Orchideja
Participants: Roman Savochenko, Maxim Lysenko
Description: The dispatching of carriage-wash system.
Materials: page (restricted access)

VMK main mn.png