From OpenSCADAWiki
The general process of configuration the SCADA system for implementation the functions of the "top level" — operator AWP, can be divided in two stages:
- Configuring the data sources, creating a database (DB) of parameters of these sources, creation of calculating-logical parameters and setting the history.
- Formation of the visual representation of the TP data by creation an interface for the operator in the form of: mnemos, groups of graphs, groups of contours, documents, and others.