УкраїнськаEnglishmRussian
Вход/Новый
В теме нет новых постов

Integration & Communication between SCADA and PLC


Автор Сообщение
Сообщение создано: 30. 11. 2017 [12:39]
Shawnturner
Shawn turner
Создатель темы
Зарегистрирован(а) с: 16.11.2017
Сообщения: 2
Hi.

Can u explain what is the important part when integration and communication between SCADA and PLC?

I'm use the DL06 KOYO PLC for our project. Until now, i'm still cant integrate our PLC with SCADA system.
Can u tell me what is the most important part to integrate between PLC and SCADA?

Thanks
Сообщение создано: 30. 11. 2017 [12:52]
roman
Roman Savochenko
Moderator
Contributor
Developer
Зарегистрирован(а) с: 12.12.2007
Сообщения: 3742
"Shawnturner" wrote:

Can u explain what is the important part when integration and communication between SCADA and PLC?

I'm use the DL06 KOYO PLC for our project. Until now, i'm still cant integrate our PLC with SCADA system.
Can u tell me what is the most important part to integrate between PLC and SCADA?

How that related to OpenSCADA also?

P.S. The forum exclusively about the project OpenSCADA then do not write here messages like to that!

Learn, learn and learn better than work, work and work.



14302